Daikin Brc1c51 61 Installation | Manual |link|

Introduction

6. Initial Setup / Test Operation

  1. Route the 2-core cable from the indoor unit to the controller location. Connect to the indoor unit's terminal block (usually terminals 1 and 2).
  2. Pass the cable through the hole in the installation plate.
  3. Strip approximately 5/16 inch (8-10mm) of insulation from the wire ends.
  4. Loosen the terminal screws on the back of the controller unit (Terminals 1 and 2).
  5. Insert the wires into the terminals. It does not matter which wire goes to Terminal 1 or 2, as the connection is non-polarized.
    • Set the temperature range and units (Fahrenheit or Celsius).
    • Choose the HVAC system type (heating, cooling, or heat pump).
    • Configure any additional features (e.g., timer, schedule).