Pwd Dsr 2017-18 Maharashtra !new!
The District Schedule of Rates (DSR), also known as the State Schedule of Rates (SSR) for the 2017-18 period, was a critical document issued by the Maharashtra Public Works Department (PWD). It established standardized pricing for construction materials, labor, and specific engineering tasks to ensure transparency and consistency in public project estimates. 1. Executive Summary
The District Schedule of Rates is not merely a price list; it is a statutory document that standardizes the cost of construction items. It provides a uniform basis for estimating the cost of works, ensuring transparency and accountability in public spending. Without a standardized DSR, each engineer or contractor would rely on subjective market assessments, leading to inconsistencies in tendering and potential irregularities. pwd dsr 2017-18 maharashtra
Components of PWD DSR 2017-18 Maharashtra The District Schedule of Rates (DSR), also known
MUMBAI, April 2026 — In the chronicles of India’s infrastructure journey, certain documents remain hidden from the public eye yet hold the blueprint of a state’s progress. One such critical dossier is the Public Works Department (PWD) District Statistical Review (DSR) for the financial year 2017-18 for Maharashtra. More than just a booklet of numbers, the DSR is a surgical audit—detailing how Maharashtra built, maintained, and financed its skeletal framework of roads, bridges, and government buildings. Executive Summary The District Schedule of Rates is
Excavation (soil, hard rock), brickwork, stone masonry, plastering, and flooring.
: The schedule covers a wide range of construction activities: Civil Works
Infrastructure Development: During 2017-18, the PWD undertook numerous projects aimed at enhancing the state's infrastructure. This included the construction of new roads, bridges, and buildings, as well as the maintenance and repair of existing infrastructure.