Tower Crane | Dismantling Method Statement

A Method Statement for Tower Crane Dismantling is a critical safety document that outlines the step-by-step procedure for safely taking down a tower crane. It ensures that all personnel are aware of their responsibilities, the sequence of operations, and the safety measures required to prevent accidents.

| Role | Responsibility | |-------|----------------| | Appointed Person (AP) | Plans the entire operation; holds legal authority to stop work. | | Crane Supervisor | Directs the dismantling crew and coordinates communication. | | Competent Crane Operator | Operates the tower crane during initial lowering steps (if applicable) or operates the mobile crane. | | Riggers / Dogmen | Attach slings, guide loads, and signal movements. | | Bankman | Ensures ground exclusion zone is maintained. | | Safety Officer | Monitors compliance with method statement and intervenes on hazards. | tower crane dismantling method statement

14. Competency and training

  • Record of certificates for crane operators, riggers, and signallers.
  • Toolbox talk records and site induction for all personnel.
  • Lifting plan and method statement acknowledged and signed by team before start.

If the crane was on a reusable base, inspect for damage. If on an expendable anchor, shear the bolts and grout the surface. table to accompany this sequence? A Method Statement for Tower Crane Dismantling is

When in doubt, stop. Re-evaluate. Then proceed. Record of certificates for crane operators, riggers, and