Virar-alibaug Multimodal Corridor Route Map [cracked] Direct

The Virar-Alibaug Multimodal Corridor (VAMMC) is a massive 126-km infrastructure project designed to bypass Mumbai’s inner-city traffic and seamlessly connect the Palghar, Thane, and Raigad districts.

  • Mumbai–Pune Expressway
  • NH-66 (Old Pune–Mumbai Highway)
  • Panvel–Karjat road

The Need for a Multimodal Corridor

4. Multimodal Features

  • Dedicated Bus Rapid Transit (BRT) in median.
  • Wide shoulders for emergency & future metro/light rail.
  • Utility corridor (water, gas, fiber optics).
  • Truck lay-bys & EV charging stations at intervals.

Implementation priorities and phasing

Phase 1 (0–4 years): Feasibility, environment clearances, design of Virar–Panvel express segment, initiate priority interchange construction, and pilot ferry integration. Phase 2 (4–8 years): Construct expressway and transit spine Virar–Panvel; build Panvel interchange and ferry terminals. Phase 3 (8–12 years): Extend to Alibaug, complete freight/industrial spurs, operationalise full multimodal services. virar-alibaug multimodal corridor route map

  • Virar: Integration with the Western Railway and proposed Metro Line 5 (Thane-Bhiwandi-Kalyan-Dombivli).
  • Bhiwandi: Connection to the Eastern Express Highway and the proposed Mumbai-Nagpur Super Expressway.
  • Khalapur: Interchange with the proposed Samara-Khalapur Highway.