In a Saudi Aramco contract, Schedule G the definitive document governing Materials, Tools, and Equipment
Step 2: Subcontractor Flow-Down
Your subcontractors are your liability. Schedule G explicitly states that prime contractors must impose the exact same SHE requirements on all subs. Require your subs to sign a "Schedule G Acknowledgment" form. If a welder from a small sub falls 20 feet, you pay the $50k fine.
Frequently Asked Questions (FAQ)
Q: Does Schedule G apply to Saudi Aramco’s joint ventures (e.g., SABIC, SASREF)? A: Yes, most JVs have adopted Schedule G or a materially identical document. Check the specific JV’s GTCs.
Storage Standards: Ensuring materials are stored according to Aramco's Technical Standards to prevent environmental degradation.
❌ Don’t:
- Assume your standard terms apply – they don’t.
- Sign without understanding arbitration & indemnity.
- Subcontract without written approval.
- Disregard Saudi VAT (15%) – ensure pricing is clear (exclusive/inclusive).
- Saudi Aramco Work Permit Receiver: Anyone authorizing a hot work or excavation permit must pass a 2-day Aramco course.
- H2S (Hydrogen Sulfide) Clearance: In oil fields, H2S is a silent killer. Schedule G mandates that all personnel entering sour service areas carry a current H2S certification card issued by an Aramco-approved vendor.
- HEAT (Helicopter Emergency Egress Training): If the project requires offshore or remote onshore helicopter transport, every passenger must have valid HEAT certification.
Schedule G often includes several attachments that detail specific requirements:
- Immediate work stoppage (28 days).
- Fine of SAR 4.2 million ($1.12 million).
- Replacement of the subcontractor at the prime contractor’s expense.
- The prime contractor was disqualified from bidding on any Aramco project for 18 months.
Key Requirements for Schedule G-Type Materials
Whether you call it Schedule G or Schedule D, the requirements for these general industrial materials remain rigorous. If you are supplying these items, here is what you must prepare for: